Emergency Response Extinguishes Level-1 Fire Within 50 Minutes
A localized fire broke out inside a temporary production control structure located behind the Prime Focus and Reliance MediaWorks studio facilities within Dadasaheb Phalke Chitranagari (Goregaon Film City). Reported at approximately 4:02 PM, the blaze produced visible plumes of thick smoke over the complex, prompting immediate panic among nearby shooting crews and studio personnel before emergency services secured the site.
Personnel from the Mumbai Fire Brigade, Brihanmumbai Municipal Corporation (BMC) Ward Control, local police, and 108 Ambulance services were deployed to the scene. Firefighters successfully contained and completely extinguished the Level-1 blaze by 4:55 PM, preventing flames from spreading to adjacent indoor sound stages or post-production facilities. Authorities confirmed that no crew members or studio staff sustained injuries during the incident.
Overview: Incident Details and Equipment Impact Assessment
| Incident Parameter | Official Status & Fire Brigade Metrics |
| Incident Location | 100 ft × 20 ft PCR Unit behind Prime Focus Studio, Goregaon (East) |
| Alert & Control Time | Reported at 4:02 PM • Fully extinguished by 4:55 PM |
| Casualties / Injuries | Zero reported (Site evacuated successfully) |
| Damaged Inventory | Electrical wiring, cables, AC units, sound gear, wooden planks, & bamboo |
| Primary Responders | Mumbai Fire Brigade, Local Police, BMC Ward Control, 108 Ambulance |
Property Damage and Electrical Wiring Vulnerabilities
According to preliminary reports from the Mumbai Fire Brigade, the fire was confined to a 100 ft × 20 ft temporary Production Control Room (PCR) set up to support ongoing feature film and television shooting schedules in the vicinity. The damage was restricted to internal electrical wiring, power cables, air conditioning units, audio-visual sound systems, wooden scaffolding, and temporary plastic fitting materials.
Film City Incident Response & Inspection Workflow: ------------------------------------------------- Level-1 Fire Reported (4:02 PM) ──> Multi-Agency Evacuation & Control (4:55 PM) ──> Electrical & Material Audit ──> Mandatory Safety SOP EnforcementInitial investigations point to a potential short-circuit within temporary electrical distribution panels as the primary trigger, highlighting long-standing vulnerabilities in high-wattage power lines used across outdoor sets.
MFSCDC and Civic Authorities Order Mandatory Studio Audits
Following the incident, the Maharashtra Film, Stage & Cultural Development Corporation (MFSCDC), which oversees operations at Film City, announced an immediate review of fire safety protocols across all leased sets and studio floors. Production houses operating within the complex have been directed to strictly verify compliance with established Standard Operating Procedures (SOPs) regarding heavy electrical wiring, fire-retardant structural materials, and accessible exit routes.
Civic fire officials emphasized that routine inspections will be conducted across temporary shooting structures to verify the availability of functional fire extinguishers, trained safety officers, and valid NOC certifications, ensuring that studio operations continue without endangering cast and crew safety.